Jobs using ‘laser level’

Garden terracing

A new terrace in an existing sloped garden was created. The new retaining wall, steps and garden path were built with materials matched to those already used on the wall and paved area on the first terrace. We also created a large garden pond, this was lined with a butyl rubber liner and to the perimeter of the pond we…
[More →]

Treatment Plant Installation

RMS was called in to undertake the installation of a new septic system to support the fishing lodge buildings. The trenches for the pipes linking the buildings to the treatment plant were excavated using the chain trencher to falls according to current building regualtions. A whole was excavated to depth determined by tank dimensions and local terrain with the guidance…
[More →]

Lake dam crest raising

To comply with Environment Agency Reservoir Act legislation the Eastnor Castle lake required alteration to allow it to have a pre-determined storm surge capacity. Detailed site plans and specifications were provided by Fairhurst engineers for the proposed works. RMS Services brought in and compacted around 1100 tonnes of sub grade material to raise a section of the dam embankment approximately…
[More →]

Clenchers Mill Leat Bypass

Approximately 300m of the leat (feeder ditch) for Clenchers Mill had previouisly been destroyed when a large duck lake was formed. As part of the long term restoration of the mill, the leat was to be re-formed for this section. Using a Laser level and machine control device set from level references gained from a site terrain survey, the new…
[More →]

Land Drainage

Here we drained a wet area in a grass field to bring it back into production once again. A trench was excavated with adequate fall using a grade laser level along with machine control reciever mounted on the excavator boom. Once the exact source of the spring water was located, a perforated land drain pipe was layed along the trench…